New Operational Block Casa di Cura Don Calabria
2 Operating Rooms
Type of construction: Operating Rooms
State of work: Completed
Date of completion: May 2017
Creation of new operating block Casa di cura Don Calabria consists of 2 operating rooms, sub sterilization, awakening preparation area, patient waiting.
For the implementation of the new Operator block of one of the most important clinics in the province of Verona, the client requested the full use of the philosophy of modular space prefabrication.
TrueSpace Wall is the perfect product for this type of application because on the same self-supporting substructure of the walls, different finishing types can be hooked up, each of which has been specially studied for a different performance.
The operating rooms, for example, were made of Corian DuPont 12mm thick coupled with 8mm thick tempered glass panel. The glass is made with high resolution digital printing and the theme of birch trunks has been reported in all other areas of the operating block.
For the ancillary rooms, the painted steel finish was chosen with a strong plasterboard support, 18mm thick. Two large visuals with LCD privacy glass have been inserted between the preparation and the recovery to darken the transparent portion effectively and very quickly.