TModule – Veneto hospitals

Luca Stefani

Thirteen triage units for Veneto hospitals Type of construction: TModule Triage unitsState of work: CompletedDate of completion: Dicembre 2021Azienda Zero has commissioned Operamed and Radar to install thirteen triage modules to helpt he hospitals of the Venetian health authority (ULSS) in the fight against Covid-19. The TModule Modular Care Units were created in collaboration with GiPlanet using the most advanced …

Pediatric Hospital Bambino Gesù in Rome

Luca Stefani

Pediatric Hospital Bambino Gesù in Rome Restructuring of the surgical unit Type of construction: Operating roomsState of work: CompletedDate of completion: December 2016Restructuring of the surgical unit of Bambino Gesù Hospital in Rome. 2 operating rooms, surgical preparation area, sub sterilization and stores located on the ground floor of Spellman wing. The rooms are built with high quality materials, Corian …

Maugeri Scientific Clinical Institutes – Pavia

Luca Stefani

Surgical unit that consists of 4 operating rooms and 2 surgical clinics, preparation rooms and recovery rooms. Type of construction: Surgical UnitState of work: CompletedDate of completion: October 2021 Construction of a surgical unit consisting of 4 operating rooms and 2 surgical clinics, preparation rooms and recovery rooms.  The operating rooms are constructed using the prefabricated Truespace wall system with Corian …

TModule – Istituto clinico Humanitas di Rozzano

Luca Stefani

The Operamed team built a 366 square metre prefabricated surgical unit, completed within thirty days, and delivered on a turnkey basis to the Lombardy Type of construction: Surgical UnitState of work: CompletedDate of completion: October 2021 The Humanitas hospital in Rozzano has chosen Tmodule technology to set up an area dedicated to the surgical treatment of Covid patients. The Operamed …

Santa Maria Maddalena hospital – Occhiobello

Luca Stefani

New surgical unit and modular patient wards Type of construction: Surgical UnitState of work: CompletedDate of completion: October 2021For the «Santa Maria Maddalena» hospital in Occhiobello, in the province of Rovigo, Operamed has built a new surgical unit including two prefabricated operating rooms and accessory rooms. The total surface area of the surgical unit is 143 square meters, in which …

Salus Hospital Clinic – Reggio Emilia

Luca Stefani

44-square-foot hybrid operating room. Type of construction: Hybrid operating roomState of work: CompletedDate of completion: October 2021 For the «Salus Hospital» clinic in Reggio Emilia, of the Villa Maria group, Operamed has created an interesting hybrid operating room. The real challenge of this project, was to incorporate all components within what was an extremely small space. The surface of the room …

Giovanni XXIII Nursing Home – Physiotherapy and gym – Monastier

Luca Stefani

Prefabricated operating room, induction and recovery boxes Type of construction: Prefabricated operating room, induction and recovery boxesState of work: CompletedDate of completion: September 2020The refurbishment of the physiotherapy service spaces of the Giovanni XXII nursing home have been completed. The environments today are more comfortable and functional thanks to a strong natural and artificial lighting, always trying to offer the …

Domus Nova Clinic – Ravenna

Luca Stefani

Operating rooms renovation Type of construction: Modular operating roomState of work: CompletedDate of completion: November 2019Client: Domus NovaFor this project, Operamed has renovated a block with four prefabricated operating rooms using the TrueSpace modular wall systemcladding. The prefabricated operating rooms were made with Corian DuPont finish, with modular panels 12 mm thick, the maximum in terms of quality, durability and ease of cleaning. Each operating rooms …

Multi-specialist nursing home Villa verde- Reggio Emilia

Luca Stefani

Renovation and requalification project with enlargement of the surgical block in the first floor and new sterilization area in the second floor. Type of construction: New surgical block and sterilization areaState of work: CompletedDate of completion: October 2019For Villa Verde nursing home Operamed has restructured the new operating block and the sterilization area with a complete turnkey contract. Operamed developed the executive design of …

Poliambulanza Foundation Hospital – Brescia

Luca Stefani

Nine prefabricated operating room for cardiovascular surgery, day surgery and electrophysiology Type of construction: Operating roomsState of work: CompletedDate of completion: October 2019The renovation project includes a new surgical block with six operating rooms, three for low complexity surgery, two for cardiovascular surgery and one hybrid room of 100 sqm, the largest in Italy, equipped with the Siemens Pheno angiograph. …

Civil hospital Sant’Agostino Estense – Baggiovara

Luca Stefani

New Siemens Pheno Hybrid room Type of construction: RefurbishmentState of work: CompletedDate of completion: March 2019For this project for the Hospital S. Agostino Estense in Baggiovara (Modena), Operamed has built a new hybrid room of about 75 square metres. The prefabricated operating hybrid room has been made with TrueSpace modular wall system and has a Corian DuPont finish, with modular …

Irccs Neuromed, Mediterranean Neurological Institute – Isernia

Luca Stefani

New surgical block and ancillary rooms Type of construction: Operating room and awakening and preparation areaState of work: CompletedDate of completion: December 2018The prefabricated operating and the ancillary rooms room has been made with TrueSpace modular wall system. The operating room has Co-laminated galvanized steel 0,8mm thick with PVC antibacterial film finish shielded with lead sheet. Into these two operating …