Santa Maria Maddalena hospital – Occhiobello

Luca Stefani

New surgical unit and modular patient wards Type of construction: Surgical UnitState of work: CompletedDate of completion: October 2021For the «Santa Maria Maddalena» hospital in Occhiobello, in the province of Rovigo, Operamed has built a new surgical unit including two prefabricated operating rooms and accessory rooms. The total surface area of the surgical unit is 143 square meters, in which …

Salus Hospital Clinic – Reggio Emilia

Luca Stefani

44-square-foot hybrid operating room. Type of construction: Hybrid operating roomState of work: CompletedDate of completion: October 2021 For the «Salus Hospital» clinic in Reggio Emilia, of the Villa Maria group, Operamed has created an interesting hybrid operating room. The real challenge of this project, was to incorporate all components within what was an extremely small space. The surface of the room …

Giovanni XXIII Nursing Home – Physiotherapy and gym – Monastier

Luca Stefani

Prefabricated operating room, induction and recovery boxes Type of construction: Prefabricated operating room, induction and recovery boxesState of work: CompletedDate of completion: September 2020The refurbishment of the physiotherapy service spaces of the Giovanni XXII nursing home have been completed. The environments today are more comfortable and functional thanks to a strong natural and artificial lighting, always trying to offer the …

Domus Nova Clinic – Ravenna

Luca Stefani

Operating rooms renovation Type of construction: Modular operating roomState of work: CompletedDate of completion: November 2019Client: Domus NovaFor this project, Operamed has renovated a block with four prefabricated operating rooms using the TrueSpace modular wall systemcladding. The prefabricated operating rooms were made with Corian DuPont finish, with modular panels 12 mm thick, the maximum in terms of quality, durability and ease of cleaning. Each operating rooms …

Multi-specialist nursing home Villa verde- Reggio Emilia

Luca Stefani

Renovation and requalification project with enlargement of the surgical block in the first floor and new sterilization area in the second floor. Type of construction: New surgical block and sterilization areaState of work: CompletedDate of completion: October 2019For Villa Verde nursing home Operamed has restructured the new operating block and the sterilization area with a complete turnkey contract. Operamed developed the executive design of …

Poliambulanza Foundation Hospital – Brescia

Luca Stefani

Nine prefabricated operating room for cardiovascular surgery, day surgery and electrophysiology Type of construction: Operating roomsState of work: CompletedDate of completion: October 2019The renovation project includes a new surgical block with six operating rooms, three for low complexity surgery, two for cardiovascular surgery and one hybrid room of 100 sqm, the largest in Italy, equipped with the Siemens Pheno angiograph. …

Civil hospital Sant’Agostino Estense – Baggiovara

Luca Stefani

New Siemens Pheno Hybrid room Type of construction: RefurbishmentState of work: CompletedDate of completion: March 2019For this project for the Hospital S. Agostino Estense in Baggiovara (Modena), Operamed has built a new hybrid room of about 75 square metres. The prefabricated operating hybrid room has been made with TrueSpace modular wall system and has a Corian DuPont finish, with modular …

Irccs Neuromed, Mediterranean Neurological Institute – Isernia

Luca Stefani

New surgical block and ancillary rooms Type of construction: Operating room and awakening and preparation areaState of work: CompletedDate of completion: December 2018The prefabricated operating and the ancillary rooms room has been made with TrueSpace modular wall system. The operating room has Co-laminated galvanized steel 0,8mm thick with PVC antibacterial film finish shielded with lead sheet. Into these two operating …

Zulekha Hospital – Dubai

Luca Stefani

New intensive care unit Type of construction: Intensive care blockState of work: CompletedDate of completion: December 2018The project involves the construction of the new surgical block and the intensive care unit. The Intensive care block involves eight boxes made with TrueSpace modular wall system and with Co-laminated galvanized steel 0,8mm with PVC antibacterial film. All hospital stay-boxes have a control …

ZULEKHA HOSPITAL- DUBAI

Luca Stefani

New surgical block Type of construction: modular operating roomsState of work: CompletedDate of completion: December 2018The project involves the construction of the new surgical block and the intensive care block. The operating block is composed by seven prefabricated operating rooms, one of which X-ray shielded. For each operating room there are ancillary rooms like sterilization and resuscitation room. The prefabricated …

ARMED FORCES HOSPITAL – OMAN

Luca Stefani

New surgical suite and intensive care unit Type of construction: modular operating roomsState of work: CompletedDate of completion: December 2018Operamed has built a new surgical block with six general surgery prefabricated operating rooms of about 50 sqm, one hybrid room of about 70 sqm and one robotic room of about 60 sqm. Connected to the operating rooms, new ancillary rooms …

Policlinico Universitario Gemelli

Luca Stefani

Operating rooms restructuring Realization of six prefabricated operating rooms for minimally invasive robotic and cardiovascular surgery Designer: OperamedType of construction: Operating roomsState of work: CompletedDate of completion: October 2018Client: Policlinico Gemelli RomaOperating block restructuring with prefabricated operating rooms paneling by TrueSpace modular walls. The prefabricated operating rooms have been realized with Corian DuPont wall finishing, the maximum in terms of …