New surgical unit and intensive care unit, Villa Maria Cecilia in Ravenna

Image

Type of construction: Operating theatre
State of work: Completed
Date of completion: 2014

Construction of the operating theatre and intensive care area at the Villa Maria Cecilia Hospital in Ravenna. The operating area was built with only prefabricated technology: technical floating floors, partitions, ceilings and furniture with antibacterial finishes. The project was completed with TRUMPF equipment and furniture.

No post was found with your current grid settings. You should verify if you have posts inside the current selected post type(s) and if the meta key filter is not too much restrictive.