Giovanni XXIII Private Clinic – Monastier (TV)

Turnkey delivery of a new operating block


At the Giovanni XXIII Private Clinic in Monastier, Operamed delivered a turnkey project for the expansion of the operating block in just seven months. The original operating block had already been built by Operamed, confirming continuity in both design and technological approach.

Operamed expanded the operating block at the Giovanni XXIII Private Clinic in Monastier. The project covered 1,200 m² and added a three-level building. The ground floor has a portico for access and logistics. The first floor extends the operating block. The second floor adds staff changing rooms.

The new block has two operating rooms of 47 m² and 63 m². Support spaces include patient and surgeon preparation areas, a control room and a technical room. Operamed designed and installed the electrical, mechanical and medical gas systems, together with the fixed equipment.

Both rooms use the TrueSpace modular system. The smaller room supports several surgical disciplines. The larger room is designed for use as a hybrid operating room, with space for complex imaging equipment such as CT scanners and angiography systems.

Finishes include DuPont™ Corian® surfaces and technical wall panels with power outlets and medical gas connections. Monitors are built into the walls. Custom furnishings include pass-through tunnels for soiled materials. Automatic sliding doors and screen-printed glass panels complete the spaces.

Operamed also supplied the medical equipment. This includes ceiling-mounted service units for surgeons and anesthesiologists, surgical lights and a video integration system. The video system can record or stream procedures to support training and remote collaboration.

Fluid & Touchless technology lets surgeons manage radiological images without touching a screen. This supports sterile working conditions. Both rooms also have 2 mm lead shielding for radiation protection, in line with the regulations described for the project.

The completed surgical hub combines the new operating rooms, support areas, technical systems and medical equipment in one coordinated project.

Progettista
Operamed

Stato del progetto
Completed

Cliente
Giovanni XXIII Private Clinic – Monastier (TV)

Tipo di costruzione
Surgical unit

Data di completamento
July 2024

Località
Italy

Scopri Truespace