Admiralty Medical Center Singapore

Luca Stefani

New Operational Block Admiralty Medical Center Singapore Three new operating roomsType of construction: Operating RoomsState of work: CompletedDate of completion: May 2017In order to achieve the highest possible standards of Infection Control, the three new operating rooms at the purpose built Admiralty Medical Center in Singapore were constructed using the latest technology in anti-microbial finishes using TrueSpace prefabricated wall panels …

Exposanità 2016

Luca Stefani

Realization fair standDesigner: Operamed srlType of construction: ExhibitionDate of completion: May 2016

Centro Polispecialistico Armonia – Porto Mantovano

Luca Stefani

Centro Polispecialistico Armonia – Porto MantovanoType of construction: Operating roomsState of work: CompletedDate of completion: April 2016Client: ARMONIA CENTRO POLISPECIALISTICOTurnkey construction of the Clinic Armonia facility in Porto Mantovano including the Surgical Endoscopy department using TrueSpace prefabrication technology. The operating theaters were built with prefabricated walls in antibacterial powder coated stainless steel enhanced with screen printed sections of steel panel. …

Casa di Cura Toniolo Bologna

Luca Stefani

New operating rooms at Casa di Cura Toniolo in BolognaType of construction: Operating roomsState of work: CompletedDate of completion: March 2016Turnkey construction with open space intensive care. The operating suite consists of 5 operating rooms totally constructed using prefabricated TrueSpace technology with antibacterial powder coated steel, automatic doors, vinyl flooring and fully sealed ceiling. Hermetically sealed external windows were integrated …

Casa Sollievo della Sofferenza Hospital – San Giovanni Rotondo

Luca Stefani

Casa Sollievo della Sofferenza Hospital San Giovanni RotondoType of construction: Operating roomState of work: CompletedDate of completion: March 2016Client: Ospedale Casa Sollievo della Sofferenza Construction of new prefabricated operating rooms as part of the restructuring of the new neuroradiology and the extention of the cardiovascular area of Casa Sollievo della Sofferenza di San Giovanni Rotondo in San Giovanni Rotondo – …

Casa di Cura Giovanni XXIII Monastier

Luca Stefani

Il nuovo blocco operatorio della Casa di Cura Giovanni XXIII – MonastierTipo di costruzione: Blocco operatorioStato del progetto: CompletatoData di completamento: Febbraio 2016Cliente: Casa di Cura Giovanni XXIIISale Operatorie, Locali preparazione e Lavaggio chirurghi realizzate con sistema di pareti prefabbricate a pannelli ispezionabili. Pareti prefabbricate composte da struttura auto-portante con isolamento in piombo sp. 2mm applicato nell’intercapedine tra struttura e pannelli. Pannelli di finitura …

Medica 2016 – Dusseldorf

Luca Stefani

European Institute of Oncology – Milan

Luca Stefani

Operating room renovationType of construction: Modular operating roomState of work: CompletedDate of completion: January 2016Owner: IEOClient: IEOThe prefabricated operating room have been made with the TrueSpace modular wall system. The operating room has a Corian DuPont slab finish, with modular panels 12 mm thick. This system allows easy and quick installation and inspection as well as ensuring the maximum quality, durability and ease of cleaning. Wall panels have been provided with Glacier White blind modules, technical modules in different colors, integrated glazed modules for the display monitors in different sizes and with high-resolution digital print inserts and stainless-steel …

Madonna Del Soccorso Hospital – San Benedetto del Tronto

Luca Stefani

Madonna Del Soccorso Hospital – San Benedetto del TrontoType of construction: Operating roomState of work: CompletedDate of completion: January2016Client: Ospedale Madonna Del Soccorso – San Benedetto del Tronto

Arab Health 2016

Luca Stefani

Designer: Operamed srlType of construction: ExhibitionDate of completion: January2016Owner: Operamed srl

Chioggia – Venice Hospital

Luca Stefani

Chioggia – Venice HospitalType of construction: Operating roomState of work: CompletedDate of completion: December 2015Owner: Ospedale di ChioggiaRealizzazione chiavi in mano del nuovo blocco operatorio presso l’Ospedale di Chioggia. Allestimento di N. 4 sale operatorie con l’utilizzo di tutta tecnologia prefabbricata comprese: porte, armadi, illuminazione ambientale e controsoffitti ispezionabili a tenuta.  

New maternity wing at Belluno Hospital

Luca Stefani

New maternity wing at Belluno HospitalType of construction: Operating roomState of work: CompletedDate of completion: November 2015Client: Ospedale San Martino BellunoTurn- key construction of the new Maternity wing at San Martino Hospital in Belluno. Realization of n. 2 operating rooms ISO 5 and sterilization area using all the prefabricated technology complete with air diffusion system on the ceiling and  structure …